|
Blue Forest http://www.lslnet.com at 19:08 on May 28, 2006
Are you prepared for the server hardware (CPU, IDE/SCSI?, RAM), on what basis?
Many days I have this problem. Long before lines have a new website ready to hire an independent server, there are two options : the distribution of HD and Dual P4/1G RAM/IDE Xeon/2G RAM/SCSI. Double the price difference. The crux of the matter is I do not know whether it is worthwhile to use Dual Pentium, because the future is unpredictable income returns, but do not know whether it can withstand the P4 site load (if not the words of what will load with Dual 550MHz). The new web site is 10 MySQL database will achieve good returns, then 50, the biggest database is 1 million records to inquiries, for example, paging inquiries such as the following :
SELECT. . . . . . Contents =123 Na'tab'al FROM WHERE AND LIMIT page_num many conditions, 20
In addition, each page is a PHP + MySQL generated by Apache Mod_Rewrite immediately. Visited unknown, a preliminary estimate daily 8000IP.
Similar data have not done websites friends, your server configuration options when considering how? |
Are you prepared for the server hardware (CPU, IDE/SCSI?, RAM), on what basis?
If large amounts of data access, but the data is very important, or propose to use the SCSI hard disk, so that the above results do not become a bottleneck because of the hard drive or hidden danger.
Of course, that the distribution of child P4 your equipment, which is more than the total of rock.
New Network, more than 10,000 virtual network N Host Configuration than the very low memory 256~512, dragging 500 points out of the virtual server |
Are you prepared for the server hardware (CPU, IDE/SCSI?, RAM), on what basis?
If necessary, we can do down and talk about |
Are you prepared for the server hardware (CPU, IDE/SCSI?, RAM), on what basis?
I am glad to hear the answer. |
| |